Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the cookie-law-info domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/besselen/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/besselen/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-google-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/besselen/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the neve domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/besselen/public_html/wp-includes/functions.php on line 6114
PULL OUT TEST | Cimentaciones para Proyectos Fotovoltaicos
Skip to content

info@besselengineering.com

C/París 5-2B / San Javier (Murcia)

968209974

PULL OUT TEST

The driving tests and the load tests on driven profiles offer essential data that determine the suitability of a location for the construction of a photovoltaic plant.

With this we were able to accurately determine the depth of kneeling and if the structural systems selected by the client are adequate based on the behavior of the terrain. An incorrect estimation of the driving length could entail risks for the structural integrity of the project, however, an overestimation would exceed its economic cost.